KINNON PARK
CERTUS UTILITY CONSULTING LTD at BURGHMUIR
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 May 2029
- Status
- Accepted to connect
- Customer
- CERTUS UTILITY CONSULTING LTD
- Site name
- KINNON PARK
- Address
- KINNON PARK, TIBBERMORE, PERTH, PERTHSHIRE AND KINROSS, PH1 1QJ
- Grid reference
- Easting 305123, northing 723706
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- BURGHMUIR
- Bulk supply point
- Not stated
- Primary substation
- BURGHMUIR GRID
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 56.925 MW registered
- Registered capacity
- 56.925 MW
- Change to maximum export capacity
- 49.5 MW
- Change to maximum import capacity
- 54.847 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 28 Sep 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 39 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 30 May 2029 (not stated in the October 2025 edition)
Also at BURGHMUIR
GSP view5 other sites at this grid supply point in the October 2026 edition, 4 of them at BURGHMUIR GRID, the same primary substation. In all, the sites here total 291 MW: 51 MW connected, 240 MW accepted to connect.
- PERTH ROYAL INFIRMARYWGM CONSULTING ENGINEERS, Other or not stated, BURGHMUIR GRID primaryAccepted8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose