CARRADALE
Grid supply point in North of Scotland (SHEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Wind | 16 | 574 MW | 186 MW | 388 MW |
| Storage | 2 | 99.8 MW | – | 99.8 MW |
| Solar | 2 | 18.2 MW | – | 18.2 MW |
| Hydro and marine | 2 | 2.3 MW | 2.3 MW | – |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not stated | 16 | 174 MW | 406 MW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 sites, 580 MW: 174 MW connected, 406 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 3 | 13.3 MW | 64.8 MW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 sites, 78.1 MW: 13.3 MW connected, 64.8 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 1 | – | 5 MW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 site, 5 MW: 5 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 2 | 1.1 MW | 30 MW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 31.1 MW: 1.1 MW connected, 30 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- ESCART ESTATE last found in the May 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 22 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- ALLT DOMHAIN WIND FARMNovember 2026 editionExport capacity changed from 64.8 MW to 0.1 MW
- CLACHAIG WIND FARMNovember 2026 editionExport capacity changed from 52.8 MW to 0.204 MW
- HILLHEAD OF GASK PV AND BESSNovember 2026 editionExport capacity changed from 14.2 MW to 5.8 MW
- ALLT DOMHAIN WIND FARMSeptember 2026 editionExport capacity changed from 0.1 MW to 64.8 MW
- CLACHAIG WIND FARMSeptember 2026 editionExport capacity changed from 0.204 MW to 52.8 MW
- GLENKILN FARMAugust 2026 editionExport capacity changed from 4 MW to 0.1 MW
- ALLT DOMHAIN WIND FARMJuly 2026 editionExport capacity changed from 64.8 MW to 0.1 MW
- GLENKILN FARMJune 2026 editionExport capacity changed from 0.1 MW to 4 MW
- ESCART ESTATEMay 2026 editionExport capacity changed from 0.1 MW to 26 MW
- CLACHAIG GLEN WIND FARMFebruary 2026 editionExport capacity changed from 0 MW to 49.9 MW
- ESCART ESTATEFebruary 2026 editionExport capacity changed from 26 MW to 0.1 MW
- GLENKILN FARMFebruary 2026 editionExport capacity changed from 4 MW to 0.1 MW
- TANGY WINDFARMOctober 2025 editionTechnology changed from Hydro and marine to Wind
- GLENKILN FARMJuly 2025 editionCustomer not stated (name not shown in the June 2025 edition)
- FINLARIG POWER STATIONApril 2025 editionTechnology stated as Hydro and marine (not stated in the March 2025 edition)
- LUSSA POWER STATIONFebruary 2025 editionTechnology stated as Hydro and marine (not stated in the January 2025 edition)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.