ESCART ESTATE
At CARRADALE
SSEN Embedded Capacity Register, May 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 29 May 2036
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- ESCART ESTATE
- Address
- ESCART ESTATE, SKIPNESS TARBET, OBAN, ARGYLL AND BUTE, PA28 6YG
- Grid reference
- Easting 179374, northing 638505
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- CARRADALE
- Bulk supply point
- Not stated
- Primary substation
- CARRADALE GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 26 MW registered
- Registered capacity
- 26 MW
- Change to maximum export capacity
- 26 MW
- Change to maximum import capacity
- 0.1 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 29 May 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- July 2025 edition
Change history
Tracked from the July 2025 edition to the May 2026 edition, across 11 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- May 2026 editionExport capacity changed from 0.1 MW to 26 MW
- February 2026 editionExport capacity changed from 26 MW to 0.1 MW
- November 2025 editionTarget energisation date stated as 29 May 2036 (not stated in the October 2025 edition)
Also at CARRADALE
GSP view22 other sites at this grid supply point in the November 2026 edition, 16 of them at CARRADALE GRID, the same primary substation. In all, the sites here total 694 MW: 188 MW connected, 506 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?