LUSSA POWER STATION
SSE GENERATION LTD at CARRADALE
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- SSE GENERATION LTD
- Site name
- LUSSA POWER STATION
- Address
- GENERATOR 2 IMPORT, CAMPBELTOWN, ARGYLL, PA28 6QP
- Grid reference
- Easting 175851, northing 624996
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- CARRADALE
- Bulk supply point
- Not stated
- Primary substation
- CAMPBELTOWN
- Connection voltage
- 11 kV
- Technology group
- Hydro and marine
- Energy source 1
- WATER, HYDRO - OTHER: 1.14 MW registered
- Registered capacity
- 1.14 MW
- Maximum export capacity
- 1.14 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1700051734060
- Import MPAN
- 1700051740880
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- February 2025 editionTechnology stated as Hydro and marine (not stated in the January 2025 edition)
Also at CARRADALE
GSP view21 other sites at this grid supply point in the November 2026 edition, 2 of them at CAMPBELTOWN, the same primary substation. In all, the sites here total 694 MW: 188 MW connected, 506 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?