QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Sunderland Royal Hospital CHP

Sunderland Royal Hospital CHP at Offerton

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Sunderland Royal Hospital CHP
Site name
Sunderland Royal Hospital CHP
Address
Sunderland Royal Hospital, Kayll Road, Sunderland, Tyne and Wear, SR4 7TP
Grid reference
Easting 437833, northing 556591
Licence area
North East (Northern Powergrid)
Grid supply point
Offerton
Bulk supply point
Offerton
Primary substation
Mount Road
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 1.5 MW registered
Registered capacity
1.5 MW
Change to maximum export capacity
1.5 MW
Change to maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
30 Jan 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Feb 2026
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Offerton

GSP view

8 other sites at this grid supply point in the November 2026 edition, 3 of them at Mount Road, the same primary substation. In all, the sites here total 78.3 MW: 7.7 MW connected, 70.6 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?