Pennywell Industrial Estate PV
Pennywell Industrial Estate PV at Offerton
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 22 Sep 2025
- Status
- Connected
- Customer
- Pennywell Industrial Estate PV
- Site name
- Pennywell Industrial Estate PV
- Address
- Nagna Kansei Ltd, Pennywell Industrial Estate, Sunderland, Tyne and Wear, SR4 9EW
- Grid reference
- Easting 434962, northing 555412
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Offerton
- Bulk supply point
- Offerton
- Primary substation
- Pallion Trading
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 2.09 MW registered
- Registered capacity
- 2.09 MW
- Maximum export capacity
- 0.99 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 14 Apr 2025
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- 1592008121214
- Last updated
- 9 May 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
- August 2026 editionStatus changed from “accepted to connect” to “connected”
- August 2026 editionExport capacity changed from 2.09 MW to 0.99 MW
Also at Offerton
GSP view8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 78.3 MW: 7.7 MW connected, 70.6 MW accepted to connect.
- Barclays, 5 Admiralty WayBarclays, 5 Admiralty Way, Gas and other fossil, Offerton 33/11kV primaryConnected1.9 MW
- Sunderland Royal Hospital CHPSunderland Royal Hospital CHP, Gas and other fossil, Mount Road primaryAccepted1.5 MW
- Sunderland Royal HospitalSunderland Royal Hospital, Gas and other fossil, Mount Road primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?