Hastings Hill Farm BESS

Hastings Hill Farm BESS at Offerton

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Planning consent
Granted 24 Jul 2025
Sunderland, reference 24/02111/FUL · Source: REPD
Customer
Hastings Hill Farm BESS
Site name
Hastings Hill Farm BESS
Address
Hastings Hill Farm, Foxcover Road, SUNDERLAND, Tyne and Wear, SR4 9LB
Grid reference
Easting 435391, northing 554572
Licence area
North East (Northern Powergrid)
Grid supply point
Offerton
Bulk supply point
Offerton
Primary substation
Hastings Hills BESS
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 38 MW registered, storage 76 MWh, 2 hours of storage
Registered capacity
38 MW
Change to maximum export capacity
38 MW
Change to maximum import capacity
36.1 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
26 Jan 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2023
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Offerton

GSP view

8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 78.3 MW: 7.7 MW connected, 70.6 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.