Barclays, 5 Admiralty Way
Barclays, 5 Admiralty Way at Offerton
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Barclays, 5 Admiralty Way
- Site name
- Barclays, 5 Admiralty Way
- Address
- Admiral Way, Doxford International Business Park, Sunderland, Tyne and Wear, SR3 3XW
- Grid reference
- Easting 436046, northing 552218
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Offerton
- Bulk supply point
- Offerton
- Primary substation
- Offerton 33/11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 1.9 MW registered
- Registered capacity
- 1.9 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1570000137559
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Offerton
GSP view8 other sites at this grid supply point in the November 2026 edition, 1 of them at Offerton 33/11kV, the same primary substation. In all, the sites here total 78.3 MW: 7.7 MW connected, 70.6 MW accepted to connect.
- Pennywell Industrial Estate PVPennywell Industrial Estate PV, Solar, Pallion Trading primaryConnected2.09 MW
- Sunderland Royal Hospital CHPSunderland Royal Hospital CHP, Gas and other fossil, Mount Road primaryAccepted1.5 MW
- Sunderland Royal HospitalSunderland Royal Hospital, Gas and other fossil, Mount Road primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose