Chillington works industrial estate

Wolverhampton power limited at Willenhall 132 25Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Oct 2017
Status
Connected
Customer
Wolverhampton power limited
Site name
Chillington works industrial estate
Address
Export Welsh Power, 2, Kingsway, Cardiff, CF10 3FD
Grid reference
Easting 318237, northing 176600
Licence area
West Midlands
Grid supply point
Willenhall 132 25Kv S Stn
Bulk supply point
Wolverhampton 132Kv S Stn
Primary substation
Wolverhampton 132/33/11Kv
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Engine (combustion / reciprocating): 16 MW registered
Registered capacity
16 MW
Maximum export capacity
16 MW
Maximum import capacity
0.309 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1470000631002
Import MPAN
1470000630996
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Willenhall 132 25Kv S Stn

GSP view

6 other sites at this grid supply point in the August 2026 edition, 1 of them at Wolverhampton 132/33/11Kv, the same primary substation. In all, the sites here total 96.1 MW: 46.2 MW connected, 49.9 MW accepted to connect.

  • West midlands grid storage twoWest midlands grid storage two ltd, Storage, Wolverhampton 132/33/11Kv primaryConnected5.34 MW
  • Great wyrley bessanglo es great wyrley ltd, StorageAccepted49.9 MW
  • WillenhallBritish rail, Gas and other fossil, Willenhall 132/25/11Kv primaryConnected11.5 MW
  • Export supplyNon fossil purchasing agency ltd, Bioenergy and wasteConnected8.75 MW
  • Wednesbury copper tubeMueller europe limited, Gas and other fossil, Willenhall 132/25/11Kv primaryConnected2.535 MW
  • Willenhall energy parkUniversity of sheffield, Storage, Willenhall 132/25/11Kv primaryConnected2.1 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose