Great wyrley bess
anglo es great wyrley ltd at Willenhall 132 25Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 22 Dec 2026
- Status
- Accepted to connect
- Customer
- anglo es great wyrley ltd
- Site name
- Great wyrley bess
- Address
- Walsall Road, Great wyrley, WS6 6AG
- Grid reference
- Easting 3992160000000000, northing 3059550000000000
- Licence area
- West Midlands
- Grid supply point
- Willenhall 132 25Kv S Stn
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.9 MW registered
- Registered capacity
- 49.9 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 49.9 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 31 Jan 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Willenhall 132 25Kv S Stn
GSP view6 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 96.1 MW: 46.2 MW connected, 49.9 MW accepted to connect.
- Chillington works industrial estateWolverhampton power limited, Gas and other fossil, Wolverhampton 132/33/11Kv primaryConnected16 MW
- West midlands grid storage twoWest midlands grid storage two ltd, Storage, Wolverhampton 132/33/11Kv primaryConnected5.34 MW
- Wednesbury copper tubeMueller europe limited, Gas and other fossil, Willenhall 132/25/11Kv primaryConnected2.535 MW
- Willenhall energy parkUniversity of sheffield, Storage, Willenhall 132/25/11Kv primaryConnected2.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose