Wednesbury copper tube
Mueller europe limited at Willenhall 132 25Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Oct 2018
- Status
- Connected
- Customer
- Mueller europe limited
- Site name
- Wednesbury copper tube
- Address
- Export Mueller Europe Limited, 136, Oxford Street, Bilston, West Midlands, WV14 7DS
- Grid reference
- Easting 395763, northing 296051
- Licence area
- West Midlands
- Grid supply point
- Willenhall 132 25Kv S Stn
- Bulk supply point
- Willenhall 132/25/11Kv
- Primary substation
- Willenhall 132/25/11Kv
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 2.535 MW registered
- Registered capacity
- 2.535 MW
- Maximum export capacity
- 0.475 MW
- Maximum import capacity
- 5.89 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1470000970915
- Import MPAN
- 1420559000006
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Willenhall 132 25Kv S Stn
GSP view6 other sites at this grid supply point in the August 2026 edition, 2 of them at Willenhall 132/25/11Kv, the same primary substation. In all, the sites here total 96.1 MW: 46.2 MW connected, 49.9 MW accepted to connect.
- Willenhall energy parkUniversity of sheffield, Storage, Willenhall 132/25/11Kv primaryConnected2.1 MW
- Chillington works industrial estateWolverhampton power limited, Gas and other fossil, Wolverhampton 132/33/11Kv primaryConnected16 MW
- West midlands grid storage twoWest midlands grid storage two ltd, Storage, Wolverhampton 132/33/11Kv primaryConnected5.34 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose