WEST QUARRY
SPRINGFIELD ENVIRONMENTAL LIMITED at PENWORTHAM WEST GSP / STANAH GSP GROUP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Planning consent
- Operational since 1992
West Lancashire · Source: REPD - Customer
- SPRINGFIELD ENVIRONMENTAL LIMITED
- Site name
- WEST QUARRY
- Address
- APPLEY LANE NORTH, APPLEY LANE NORTH, WIGAN, GREATER MANCHESTER, WN6 9AE
- Grid reference
- Easting 352297, northing 409491
- Licence area
- North West England (ENWL)
- Grid supply point
- PENWORTHAM WEST GSP / STANAH GSP GROUP
- Bulk supply point
- WRIGHTINGTON
- Primary substation
- STANDISH
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 4.5 MW registered
- Registered capacity
- 4.5 MW
- Maximum export capacity
- 4.275 MW
- Maximum import capacity
- 0.038 MW
- Change to maximum export capacity
- Not stated
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Date connected
- 1 Apr 2002
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1620000631871
- Import MPAN
- 1600000160317
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at PENWORTHAM WEST GSP / STANAH GSP GROUP
GSP view62 other sites at this grid supply point in the October 2026 edition, 3 of them at STANDISH, the same primary substation. In all, the sites here total 829 MW: 463 MW connected, 366 MW accepted to connect.
- RIGBY HOUGHTON LANDFILLINFINIS ENERGY SERVICES LIMITED, Bioenergy and waste, STANDISH primaryConnected4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.