FRANKLAW WWTW

POWER LINK RENEWABLE ASSETS LIMITED at STANAH/PENWORTHAM WEST

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
POWER LINK RENEWABLE ASSETS LIMITED
Site name
FRANKLAW WWTW
Address
PRESTON, LANCASHIRE, PR3 0PJ
Grid reference
Easting 349342, northing 442352
Licence area
North West England (ENWL)
Grid supply point
STANAH/PENWORTHAM WEST
Bulk supply point
THORNTON
Primary substation
GARSTANG
Connection voltage
6.6 kV
Technology group
Solar
Energy source 1
SOLAR, PV: 4.682 MW registered
Registered capacity
4.682 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
4.682 MW
Change to maximum import capacity
4.725 MW
Flexible connection
Not stated
In a connection queue
Not stated
Date accepted
22 Oct 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Nov 2025
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at PENWORTHAM WEST GSP / STANAH GSP GROUP

GSP view

62 other sites at this grid supply point in the September 2026 edition, 1 of them at GARSTANG, the same primary substation. In all, the sites here total 829 MW: 463 MW connected, 366 MW accepted to connect.

See all 62

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose