LAWNS FARM, BALLAM ROAD, PEEL

LIGHTSOURCE RENEWABLE ENERGY HOLDINGS at PENWORTHAM WEST GSP / STANAH GSP GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Planning consent
Granted 1 Feb 2023
Fylde, reference 21/0904 · Source: REPD
Contract for Difference
Allocation Round 5
Customer
LIGHTSOURCE RENEWABLE ENERGY HOLDINGS
Site name
LAWNS FARM, BALLAM ROAD, PEEL
Address
LAWNS FARM, LAWNS FARM, BLACKPOOL, LANCASHIRE, FY8 4NG
Grid reference
Easting 336711, northing 431047
Licence area
North West England (ENWL)
Grid supply point
PENWORTHAM WEST GSP / STANAH GSP GROUP
Bulk supply point
LYTHAM
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 20 MW registered
Registered capacity
21.053 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
6 Nov 2018
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at PENWORTHAM WEST GSP / STANAH GSP GROUP

GSP view

62 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 829 MW: 463 MW connected, 366 MW accepted to connect.

See all 62

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.

Contract for Difference

The Contracts for Difference allocation round for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition. QueueWatch matched the site to that record.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.