OPDE UK Limited

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026, SSEN’s November 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “OPDE UK Limited” (8 sites), “OPDE UK LTD” (4 sites), “OPDE UK LIMITED” (2 sites), “OPDE UK LTS” (1 site) and “Opde uk limited” (1 site).

16sites of 1 MW and over
618 MWcapacity
9 MWconnected (1 site)
609 MWaccepted to connect (15 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition8217 MW9 MW208 MW
NGEDAugust 2026 edition154 MW–54 MW
SSENNovember 2026 edition6308 MW–308 MW
ENWLOctober 2026 edition140 MW–40 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar10304 MW9 MW295 MW
Storage4207 MW–207 MW
Wind154 MW–54 MW
Other or not stated152.7 MW–52.7 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Padwick farmNGEDCellarhead 132KvWindAccepted to connect54
50MWSSENBRORAOther or not statedAccepted to connect52.68
BALGONIE FARM 50MW BATTERYSSENABERNETHYStorageAccepted to connect52.68
BLINDWELLS FARMSSENARBROATHStorageAccepted to connect52.68
BUCKIES FARMSSENTHURSO SOUTH GRIDStorageAccepted to connect52.68
Hall FarmUKPNBramfordSolarAccepted to connect49.4
MORENISHSSENKILLINStorageAccepted to connect49.4
RYCOTE FARMSSENCOWLEY GSPSolarAccepted to connect47.5
DORMANSTEADS PCENWLHARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPSolarAccepted to connect40
(ANM) Bardwell Fields FarmUKPNBramfordSolarAccepted to connect29.63

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
BramfordUKPN6–188 MW
Cellarhead 132KvNGED1–54 MW
ABERNETHYSSEN1–52.7 MW
ARBROATHSSEN1–52.7 MW
BRORASSEN1–52.7 MW
THURSO SOUTH GRIDSSEN1–52.7 MW
KILLINSSEN1–49.4 MW
COWLEY GSPSSEN1–47.5 MW
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPENWL1–40 MW
NorwichUKPN1–20 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 8 sites matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 6 sites matched. Every October site and every November site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 1 site matched. Every September site and every October site had a match in the other edition.

  • BALGONIE FARM 50MW BATTERYSSEN, November 2026 editionExport capacity changed from 50 MW to 52.68 MW
  • MORENISHSSEN, November 2026 editionExport capacity changed from 49.4 MW to 52 MW
  • BALGONIE FARM 50MW BATTERYSSEN, September 2026 editionExport capacity changed from 52.68 MW to 50 MW
  • MORENISHSSEN, September 2026 editionExport capacity changed from 52 MW to 49.4 MW
  • MORENISHSSEN, July 2026 editionExport capacity changed from 49.4 MW to 52 MW
  • BALGONIE FARM 50MW BATTERYSSEN, June 2026 editionExport capacity changed from 50 MW to 52.68 MW
  • MORENISHSSEN, May 2026 editionExport capacity changed from 52 MW to 49.4 MW
  • MORENISHSSEN, April 2026 editionExport capacity changed from 49.4 MW to 52 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?