Distribution / Sites / Customer

ig renewables ltd

Customer named in the DNOs' registers

In UKPN's October 2026, NGED's August 2026 and SSEN's September 2026 editions

The registers spell this customer’s name more than one way: “ig renewables ltd” (3 sites), “IG RENEWABLES LTD” (2 sites), “IG Renewables Limited” (2 sites), “Ig renewables ltd” (2 sites) and “IG Renewables Ltd” (1 site).

10sites of 1 MW and over
204 MWcapacity
–connected (0 sites)
204 MWaccepted to connect (10 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition329.3 MW–29.3 MW
NGEDAugust 2026 edition584.6 MW–84.6 MW
SSENSeptember 2026 edition290.2 MW–90.2 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar9199 MW–199 MW
Storage14.9 MW–4.9 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
The barn pvNGEDPembroke Power StationSolarAccepted to connect49.9
DAVIDSON FARM PV AND BESSSSENKEITHSolarAccepted to connect45.1
DAVIDSON FARM PV AND BESSSSENKEITHSolarAccepted to connect45.1
(ANM) The GranaryUKPNBramfordSolarAccepted to connect20
Days pottlers laneNGEDExeter Main SgpSolarAccepted to connect20
Manor FarmUKPNWymondleySolarAccepted to connect4.9
Pigs hillNGEDBridgwater SgpSolarAccepted to connect4.9
Slough farm pv & bessNGEDExeter Main SgpStorageAccepted to connect4.9
Willand road pvNGEDExeter Main SgpSolarAccepted to connect4.9
Quickbourne LaneUKPNNinfieldSolarAccepted to connect4.4

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
KEITHSSEN2–90.2 MW
Pembroke Power StationNGED1–49.9 MW
Exeter Main SgpNGED3–29.8 MW
BramfordUKPN1–20 MW
Bridgwater SgpNGED1–4.9 MW
WymondleyUKPN1–4.9 MW
NinfieldUKPN1–4.4 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 3 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

SSEN, August 2026 edition to September 2026 edition, for this customer's sites: 0 sites matched. 4 sites couldn't be matched between the two editions, because their details changed or they appear in only one.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose