Kingsnorth Industrial Estate, Rochester Road

Energy And System Technical Limited at Kingsnorth

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
27 Nov 2024
Status
Accepted to connect
Customer
Energy And System Technical Limited
Site name
Kingsnorth Industrial Estate, Rochester Road
Address
Unit 9 Kingsnorth Industrial Estate, Gamma Road, Hoo, Rochester, Kent, ME3 9ND
Grid reference
Easting 580729, northing 173211
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Kingsnorth
Bulk supply point
Not stated
Primary substation
Kingsnorth Grid 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Other: 2 MW registered
Registered capacity
2 MW
Change to maximum export capacity
2 MW
Change to maximum import capacity
0.1 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
6 Jun 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jun 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Kingsnorth

GSP view

17 other sites at this grid supply point in the October 2026 edition, 3 of them at Kingsnorth Grid 11kV, the same primary substation. In all, the sites here total 241 MW: 125 MW connected, 116 MW accepted to connect.

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose