Delays and exits in the transmission queue since 2021How often connection dates move, and how many projects leave the queue. Gate 2 in the transmission queueHow much of the queue has a Gate 2 offer, and what it did to connection dates. The battery queue and CMP470’s commitment feeHow far the battery queue sits above the line that would switch CMP470’s commitment fee off. Changes of customer in the transmission queueHow often connection agreements move between companies, and how those projects fared. Do projects connect on time?How late stages have connected against their connection date in the register. Which connection dates slip least?Which connection dates are pushed back least, allowing for how far ahead they are. Grid outages and the connections due by 2030How many of their planned outages the transmission owners carry out, against the connections due by 2030.

More analyses are on the way.

Bluestone Energy Ltd

Customer named in the TEC register

19projects in the register
5.2 GWstill to connect
0 MWof that with Gate 2 offers
0 MWconnected now

Projects

ProjectConnection siteTechnologyQueued MWConnection dateGateStatus
Dougliehill BESSDEVOL MOOR 132/33KV GRID SUPPLY POINT SUBSTATIONStorage4931 Oct 2026 Past dateGate 1Scoping
Scottish Water Laigh Park STWBraehead Park 132/33kVStorage5028 Jun 2028Gate 1Scoping
Stanley Water WTW BESSPaisley GSPStorage601 Oct 2028Not statedScoping
Scottish Water Bonnybridge STW 60MW BESSBonnybridge 132/33kVStorage6031 Oct 2030 +3 moGate 1Scoping
SEC 1 BESSFinnieston GSPStorage6017 Jul 2031Gate 1Scoping
Middleton Farm BESSMIDDLETON FARM 400KV SUBSTATIONStorage93725 Oct 2033Gate 1Scoping
High Bardrain Wood & MoorHIGH BARDRAIN WOOD & MOOR 132KV SUBSTATIONStorage24031 Oct 2033Gate 1Scoping
Lacey's Farm BESSSouth Anglia Connection Node C 400kV SubstationStorage92431 Oct 2033Gate 1Scoping
RAF Newton PV solarStoke Bardolph GSPSolar15030 Oct 2034Not statedScoping
Drakelow Power Station 1 BESSDERBYSHIRE CONNECTION NODE E 132KV SUBSTATIONStorage24031 Oct 2034Gate 1Scoping
St. Marys Lane - Upminster BESSWarley 132kV SubstationStorage24031 Oct 2036Gate 1Scoping
Upminster Warley 3Warley 132kV SubstationStorage24031 Oct 2036Gate 1Scoping
Drakelow Power Station 2 BESSDERBYSHIRE CONNECTION NODE E 132 KV SUBSTATIONStorage24030 Oct 2037Gate 1Scoping
Drakelow Power Station 3 BESSERBYSHIRE CONNECTION NODE E 132kV SUBSTATIONStorage24030 Oct 2037Gate 1Scoping
Drakelow Power Station 4DERBYSHIRE CONNECTION NODE E 132 KV SUBSTATIONStorage24030 Oct 2037Gate 1Scoping
Beddington 2 BESSLondon South Connection Node A 132kV SubstationStorage24031 Oct 2037Gate 1Scoping
Grovers Farm BESSWest London Connection Node B 132kV substationStorage24031 Oct 2037Gate 1Scoping
Upper College Farm BESSNORTH KENT CONNECTION NODE C 132KV SUBSTATIONStorage48031 Oct 2037Gate 1Scoping
CRT Keadby 2Trent Valley North Connection Node B 132kV SubstationStorage24030 Oct 2039Gate 1Scoping

Left the register since January 2021: Scottish Water Airdrie STW 60MW BESS (45 MW), Cathkin Quarry BESS (60 MW), Summerston PV 50MW (50 MW), Malcolmwood Farm BESS (60 MW).

Recent changes

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Status definitions (NESO)

Scoping: NESO is not aware that a planning application has been made.

Awaiting Consents: NESO is aware, or the customer has told it, that a planning application has been made.

Consents Approved: NESO is aware, or the customer has told it, that the planning application has been approved.

Terminated: used by NESO only in its register of 30 April 2021, for two projects that left the register the next month.

These statuses are NESO’s, not QueueWatch’s, and NESO describes them as “as far as we are aware”, so a project may be further along than its status shows.

Source: NESO