Bonnybridge 132/33kV
South Scotland, SP Energy Networks
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Drummarnock Wind Farm | Drummarnock Wind Farm Limited | Onshore wind | 30 | 1 Oct 2026 Past date | Not stated | Scoping |
| Scottish Water Bonnybridge STW 60MW BESS | Bluestone Energy Ltd | Storage | 60 | 31 Oct 2030 +3 mo | Gate 1 | Scoping |
Recent changes
- Scottish Water Bonnybridge STW 60MW BESSSouth Scotland, StorageConnection date moved from 31 Jul 2030 to 31 Oct 2030 (+3 months)+3 mo
- Scottish Water Bonnybridge STW 60MW BESSSouth Scotland, StorageConnection point changed from Bonnybridge 275/33kV Substation to Bonnybridge 132/33kV
- Scottish Water Bonnybridge STW 60MW BESSSouth Scotland, StorageMarked as Gate 1
- Scottish Water Bonnybridge STW 60MW BESSSouth Scotland, StorageConnection date moved from 31 Oct 2030 to 31 Jul 2030 (−3 months)−3 mo
- Scottish Water Bonnybridge STW 60MW BESSSouth Scotland, StorageAdded to the registerNew
- Drummarnock Wind FarmSouth Scotland, Onshore windConnection point changed from Bonnybridge 275/132/33kV to Bonnybridge 132/33kV
- Drummarnock Wind FarmSouth Scotland, Onshore windSubstation name updated in the register (from Bonnybridge GSP to Bonnybridge 275/132/33kV)
- Drummarnock Wind FarmSouth Scotland, Onshore windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?