Walton Water Treatment Works
Affinity Water Limited at West Weybridge
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 27 Mar 2013
- Status
- Connected
- Customer
- Affinity Water Limited
- Site name
- Walton Water Treatment Works
- Address
- Walton Lane, Walton-On-Thames, Surrey, KT12 1QP
- Grid reference
- Easting 508652, northing 166237
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- West Weybridge
- Bulk supply point
- West Weybridge Grid 33kV
- Primary substation
- Walton 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Other: 1.2 MW registered
- Registered capacity
- 1.2 MW
- Maximum export capacity
- 1.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900090934948
- Import MPAN
- 1900020430212
- Last updated
- 12 Jul 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Weybridge
GSP view9 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 88.5 MW: 16.6 MW connected, 71.9 MW accepted to connect.
- Land 1A Priory StablesConrad Energy (Developments) II Limited, Gas and other fossil, Chertsey 11kV primaryAccepted18 MW
- Elmer WTW 174946Sutton and East Surrey Water plc, Solar, Leatherhead Town 11kV primaryConnected3.4 MW
- Shalford Water Treatment WorksThames Water Utilities Limited, Gas and other fossil, Shalford 11kV primaryConnected1.5 MW
- Land Off Board School RoadThameswey Sustainable Communities, Gas and other fossil, Woking 11kV primaryConnected1.49 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?