Guildford STW
Thames Water at West Weybridge
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 10 Jul 2025
- Status
- Accepted to connect
- Customer
- Thames Water
- Site name
- Guildford STW
- Address
- Westfield Road, Guilford, Surrey, GU1 1SF
- Grid reference
- Easting 500419, northing 152357
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- West Weybridge
- Bulk supply point
- Guildford Grid 132kV
- Primary substation
- Guildford 'B' 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 4 MW registered
- Registered capacity
- 4 MW
- Change to maximum export capacity
- 4 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 2 Nov 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionTarget energisation date moved from 30 Apr 2025 to 10 Jul 2025 (2 months later)
Also at West Weybridge
GSP view9 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 88.5 MW: 16.6 MW connected, 71.9 MW accepted to connect.
- Land 1A Priory StablesConrad Energy (Developments) II Limited, Gas and other fossil, Chertsey 11kV primaryAccepted18 MW
- Elmer WTW 174946Sutton and East Surrey Water plc, Solar, Leatherhead Town 11kV primaryConnected3.4 MW
- Shalford Water Treatment WorksThames Water Utilities Limited, Gas and other fossil, Shalford 11kV primaryConnected1.5 MW
- Land Off Board School RoadThameswey Sustainable Communities, Gas and other fossil, Woking 11kV primaryConnected1.49 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?