Land To The North Of Sewage Works
Cuxton Energy Storage Limited at Kingsnorth
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Dec 2024
- Status
- Accepted to connect
- Customer
- Cuxton Energy Storage Limited
- Site name
- Land To The North Of Sewage Works
- Address
- Rochester Road, Cuxton, Rochester, Kent, ME2 1LB
- Grid reference
- Easting 570954, northing 166403
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Kingsnorth
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.5 MW registered
- Registered capacity
- 49.5 MW
- Change to maximum export capacity
- 49.5 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 16 Aug 2017
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Apr 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Kingsnorth
GSP view17 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 241 MW: 125 MW connected, 116 MW accepted to connect.
- Kingsnorth Power StationMedway Energy Recovery Limited, Bioenergy and waste, Kingsnorth Grid 132kV primaryAccepted49.9 MW
- Kingsnorth Works 324531Ashford Power Limited, Gas and other fossil, Kingsnorth Grid 11kV primaryConnected21 MW
- Medway Enterprise CentreReliance Energy Limited, Gas and other fossil, Strood 11kV primaryConnected20 MW
- Land On East Side Of Rochester RoadUrban Reserve Storage Limited, Storage, Medway 11kV primaryConnected5.06 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose