Lye Green Solar Farm

Exagen Development Limited at Elstree

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2033
Status
Accepted to connect
Customer
Exagen Development Limited
Site name
Lye Green Solar Farm
Address
St Albans, Hertfordshire, AL2 3NN
Grid reference
Easting 511679, northing 205247
Licence area
Eastern Power Networks (EPN)
Grid supply point
Elstree
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 50 MW registered
Registered capacity
50 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
0.5 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
10 Mar 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Jul 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Elstree

GSP view

19 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 225 MW: 157 MW connected, 68 MW accepted to connect.

  • Tollgate FarmBrockwell Storage & Solar Limited, StorageConnected49.5 MW
  • Spring WayEnergetics Electricity, Gas and other fossilConnected30 MW
  • Eastman WayUK PowerReserve Limited, Gas and other fossilConnected20 MW
  • Tollgate FarmBrockwell Storage & Solar Limited, SolarAccepted16 MW
  • Gyron Maylands DatacentreGyron Internet Limited, Gas and other fossil, Industrial Primary 11kV primaryConnected8 MW
  • Mirror Colour Print LtdTrinity Mirror, Gas and other fossil, Bushey Mill Grid 11kV primaryConnected7.2 MW
  • Booker Cash & CarrySterling Power Utilities, Gas and other fossil, Tunnel Primary 11kV primaryConnected5.5 MW
  • (ANM) Hatfield GridAMP PLC, Storage, Hatfield Primary 11kV primaryConnected5.1 MW

See all 19

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose