QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Tollgate Farm

Brockwell Storage & Solar Limited at Elstree

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
3 May 2023
Status
Connected
Customer
Brockwell Storage & Solar Limited
Site name
Tollgate Farm
Address
St Albans, Hertfordshire, AL4 0NY
Grid reference
Easting 521304, northing 205438
Licence area
Eastern Power Networks (EPN)
Grid supply point
Elstree
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.5 MW registered
Registered capacity
49.5 MW
Maximum export capacity
49.5 MW
Maximum import capacity
49.5 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1097000000476
Import MPAN
Not stated
Last updated
14 Nov 2023
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Elstree

GSP view

19 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 225 MW: 157 MW connected, 68 MW accepted to connect.

See all 19

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose