Halsville Quarter
WSP at West Ham
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- WSP
- Site name
- Halsville Quarter
- Address
- Halsville Road, Rathbone Street, Canning Town, London, E16 1EA
- Grid reference
- Easting 539633, northing 181228
- Licence area
- London Power Networks (LPN)
- Grid supply point
- West Ham
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 1.2 MW registered
- Registered capacity
- 1.2 MW
- Maximum export capacity
- 1.2 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 9 Oct 2019
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Dec 2025
- Tracked since
- September 2026 edition
Change history
Tracked from the September 2026 edition to the October 2026 edition, across 2 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No change to any detail QueueWatch tracks.
Also at West Ham
GSP view10 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 28.3 MW: 25.3 MW connected, 3 MW accepted to connect.
- Riverside SouthHurley Palmer Flatt Limited, Gas and other fossil, West Ferry Circus 11kV primaryConnected5.7 MW
- Abbey Mills Pumping StationThames Water Utilities Limited, Gas and other fossil, West Ham Grid 11kV primaryConnected4 MW
- Greenwich Peninsula Energy CentreGreenwich Peninsula Energy Centre, Gas and other fossil, Old School Close 11kV primaryConnected1.99 MW
- Land At London'S Excel CentreNet Zero Marine Services Limited, Storage, Silvertown B 11kV primaryAccepted1.5 MW
- North Woolwich RoadMinoco Royal Wharf Energy Centre, Gas and other fossil, Silvertown B 11kV primaryConnected1.4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?