(ANM) Dogsthorpe Landfill Site
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Infinis Limited
- Site name
- (ANM) Dogsthorpe Landfill Site
- Address
- Welland Road, Peterborough, Cambridgeshire, PE1 3TD
- Grid reference
- Easting 520403, northing 302100
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Walpole
- Bulk supply point
- Not stated
- Primary substation
- Peterborough East Grid 11kV
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 7 MW registered
- Registered capacity
- 7 MW
- Change to maximum export capacity
- 7 MW
- Change to maximum import capacity
- 0.15 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 24 Jan 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Jan 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Walpole
GSP view98 other sites at this grid supply point in the November 2026 edition, 4 of them at Peterborough East Grid 11kV, the same primary substation. In all, the sites here total 3.3 GW: 1.3 GW connected, 2.0 GW accepted to connect.
- Flag Fen Sewage Treatment WorksAnglian Water Services Limited, Gas and other fossil, Peterborough East Grid 11kV primaryConnected2.5 MW
- Shanks Mcewan LtdShanks Mcewan Ltd, Bioenergy and waste, Peterborough East Grid 11kV primaryConnected1.96 MW
- Flag Fen Sewage Treatment WorksAnglian Water Services Limited, Solar, Peterborough East Grid 11kV primaryConnected1.2 MW
- Eye Landfill siteBiffa Waste Services, Bioenergy and waste, Peterborough East Grid 11kV primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?