Woolton WwTW
Renewable Power Systems Ltd at Rainhill
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 2 Oct 2015
- Status
- Connected
- Customer
- Renewable Power Systems Ltd
- Site name
- Woolton WwTW
- Address
- Wood Lane Landfill Site, Wood Lane, Ellesmere, Merseyside, SY12 HY
- Grid reference
- Easting 343524, northing 387361
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Rainhill
- Bulk supply point
- GATEACRE GT1 / HUYTON GT1 / KIRKBY GT3 / PRESCOT GT1A
- Primary substation
- CHILDWALL FIVEWAYS/LYNDENE RD/MIDDLEMASS HEY/NAYLORS RD
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.01 MW registered
- Registered capacity
- 1.01 MW
- Maximum export capacity
- 1.01 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300060146340
- Import MPAN
- 1300060146312
- Last updated
- 20 Dec 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Rainhill
GSP view26 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 216 MW: 183 MW connected, 33 MW accepted to connect.
- Stobart ParkBurmeister & Wain Scandinavian (Bwsc)/ Bioenergy Infrastructure Group, Bioenergy and wasteConnected20 MW
- ENWL_DER_0001 (Lodge Lane South (55/60880)Gas and other fossil, Newton Le Willows primaryConnected19.999 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose