Rainhill
Grid supply point in Merseyside, Cheshire and North Wales (SPM)
SPEN Embedded Capacity Register >1MW, September 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Gas and other fossil | 13 | 117 MW | 117 MW | – |
| Solar | 7 | 49.2 MW | 22.1 MW | 27.1 MW |
| Bioenergy and waste | 6 | 43.6 MW | 43.6 MW | – |
| Storage | 1 | 6.1 MW | – | 6.1 MW |
Storage capacity in MWh: not published by SPEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BOLD G2A / PRESCOT GT1B / WIDNES GT1 / WIDNES GT2 | 1 | 3.6 MW | – | ||||||||||||||||||||||||||
1 site, 3.6 MW: 3.6 MW connected
| |||||||||||||||||||||||||||||
| BOLD G2A / PRESCOT GT1B / WIDNES GT1 / WIDNES GT2 | 1 | 3 MW | – | ||||||||||||||||||||||||||
1 site, 3 MW: 3 MW connected
| |||||||||||||||||||||||||||||
| BOLD G2A / PRESCOT GT1B / WIDNES GT1 / WIDNES GT2 | 4 | 37.5 MW | 6.1 MW | ||||||||||||||||||||||||||
4 sites, 43.6 MW: 37.5 MW connected, 6.1 MW accepted to connect
| |||||||||||||||||||||||||||||
| RAVENHEAD G1A1 / ST HELENS GT2B / WINDLE GT1 | 1 | 10 MW | – | ||||||||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| |||||||||||||||||||||||||||||
| RAVENHEAD G1A1 / ST HELENS GT2B / WINDLE GT1 | 1 | 10 MW | – | ||||||||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| |||||||||||||||||||||||||||||
| RAVENHEAD G1A1 / ST HELENS GT2B / WINDLE GT1 | 2 | 4 MW | – | ||||||||||||||||||||||||||
2 sites, 4 MW: 4 MW connected
| |||||||||||||||||||||||||||||
| RAVENHEAD G1A1 / ST HELENS GT2B / WINDLE GT1 | 1 | 20 MW | – | ||||||||||||||||||||||||||
1 site, 20 MW: 20 MW connected
| |||||||||||||||||||||||||||||
| Golborne | 1 | 20 MW | – | ||||||||||||||||||||||||||
1 site, 20 MW: 20 MW connected
| |||||||||||||||||||||||||||||
| Golborne | 1 | – | 10 MW | ||||||||||||||||||||||||||
1 site, 10 MW: 10 MW accepted to connect
| |||||||||||||||||||||||||||||
| Golborne | 1 | 5.8 MW | – | ||||||||||||||||||||||||||
1 site, 5.8 MW: 5.8 MW connected
| |||||||||||||||||||||||||||||
| BOLD G2B / RAVENHEAD G1A2 / ST HELENS GT2A | 1 | 10 MW | – | ||||||||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| |||||||||||||||||||||||||||||
| BOLD G2B / RAVENHEAD G1A2 / ST HELENS GT2A | 2 | 4.6 MW | – | ||||||||||||||||||||||||||
2 sites, 4.6 MW: 4.6 MW connected
| |||||||||||||||||||||||||||||
| BOLD G2B / RAVENHEAD G1A2 / ST HELENS GT2A | 1 | 15 MW | – | ||||||||||||||||||||||||||
1 site, 15 MW: 15 MW connected
| |||||||||||||||||||||||||||||
| HALEWOOD GT1 / HALEWOOD GT2 | 1 | – | 17.1 MW | ||||||||||||||||||||||||||
1 site, 17.1 MW: 17.1 MW accepted to connect
| |||||||||||||||||||||||||||||
| HALEWOOD G1B / HALEWOOD G2B / HALEWOOD GT3 / SPEKE GT1A | 1 | 10 MW | – | ||||||||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| |||||||||||||||||||||||||||||
| GATEACRE GT1 / HUYTON GT1 / KIRKBY GT3 / PRESCOT GT1A | 1 | 3.7 MW | – | ||||||||||||||||||||||||||
1 site, 3.7 MW: 3.7 MW connected
| |||||||||||||||||||||||||||||
| GATEACRE GT1 / HUYTON GT1 / KIRKBY GT3 / PRESCOT GT1A | 2 | 3.5 MW | – | ||||||||||||||||||||||||||
2 sites, 3.5 MW: 3.5 MW connected
| |||||||||||||||||||||||||||||
| GATEACRE GT1 / HUYTON GT1 / KIRKBY GT3 / PRESCOT GT1A | 1 | 1.2 MW | – | ||||||||||||||||||||||||||
1 site, 1.2 MW: 1.2 MW connected
| |||||||||||||||||||||||||||||
| GATEACRE GT1 / HUYTON GT1 / KIRKBY GT3 / PRESCOT GT1A | 1 | 1 MW | – | ||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| |||||||||||||||||||||||||||||
| HALEWOOD / SPEKE | 1 | 7.7 MW | – | ||||||||||||||||||||||||||
1 site, 7.7 MW: 7.7 MW connected
| |||||||||||||||||||||||||||||
| Not stated | 1 | 12.5 MW | – | ||||||||||||||||||||||||||
1 site, 12.5 MW: 12.5 MW connected
| |||||||||||||||||||||||||||||
What changed recently
Changes to sites here found in both editions of each pair, newest first.
August 2026 edition to September 2026 edition: 27 sites matched. Every August site and every September site at this grid supply point had a match in the other edition.
- Getrag(Ford)August 2026 editionTechnology changed from Solar to Gas and other fossil
- JAGUAR LANDROVERAugust 2026 editionCapacity changed from 15.4 MW to 17.11 MW
- JAGUAR LANDROVERAugust 2026 editionExport capacity changed from 0.999 MW to 4.95 MW
- JAGUAR LANDROVERAugust 2026 editionTechnology changed from Gas and other fossil to Solar
- Getrag(Ford)July 2026 editionTechnology changed from Gas and other fossil to Solar
- JAGUAR LANDROVERJuly 2026 editionTechnology changed from Solar to Gas and other fossil
- BYK AdditivesJune 2026 editionCustomer stated as BYK Additives Limited (not stated in the May 2026 edition)
- Getrag(Ford)June 2026 editionTechnology changed from Solar to Gas and other fossil
- JAGUAR LANDROVERJune 2026 editionTechnology changed from Gas and other fossil to Solar
- Ditton RoadMay 2026 editionCustomer changed from Horizon Power & Energy Ltd to Halton Borough Council
- JAGUAR LANDROVERMay 2026 editionCustomer stated as Jaguar Land Rover Ltd (not stated in the April 2026 edition)
- Getrag(Ford)April 2026 editionTechnology changed from Gas and other fossil to Solar
- JAGUAR LANDROVERApril 2026 editionTechnology changed from Solar to Gas and other fossil
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.