JAGUAR LANDROVER

Jaguar Land Rover Ltd at Rainhill

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2026
Status
Accepted to connect
Customer
Jaguar Land Rover Ltd
Site name
JAGUAR LANDROVER
Address
Speke, Liverpool, Merseyside, L24 9BJ
Grid reference
Easting 344911, northing 384426
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Rainhill
Bulk supply point
HALEWOOD GT1 / HALEWOOD GT2
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 7.6 MW registered
Energy source 2
Fossil - Gas, Steam-gas turbine (CCGT): 7.8 MW registered
Energy source 3
2 MW registered
Registered capacity
17.11 MW
Change to maximum export capacity
4.95 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Yes
Date accepted
24 Apr 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
4 Oct 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Capacity changed from 15.4 MW to 17.11 MW
  • August 2026 edition
    Technology changed from Gas and other fossil to Solar
  • August 2026 edition
    Export capacity changed from 0.999 MW to 4.95 MW
  • July 2026 edition
    Technology changed from Solar to Gas and other fossil
  • June 2026 edition
    Technology changed from Gas and other fossil to Solar
  • May 2026 edition
    Customer stated as Jaguar Land Rover Ltd (not stated in the April 2026 edition)
  • April 2026 edition
    Technology changed from Solar to Gas and other fossil

Also at Rainhill

GSP view

26 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 216 MW: 183 MW connected, 33 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?