QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Alexandra Park

Gpe Alexandra Park at Rainhill

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
9 Mar 2020
Status
Connected
Customer
Gpe Alexandra Park
Site name
Alexandra Park
Address
Gpe Alexandra Park, Alexandra Park, St Helens, Merseyside, WA10 3TP
Grid reference
Easting 350001, northing 394746
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Rainhill
Bulk supply point
BOLD G2B / RAVENHEAD G1A2 / ST HELENS GT2A
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 15 MW registered
Registered capacity
15 MW
Maximum export capacity
15 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300060901952
Import MPAN
Not stated
Last updated
14 Sep 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Rainhill

GSP view

26 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 216 MW: 183 MW connected, 33 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?