Parciau Solar Park

Quintas Energy UK at Pentir

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
19 Mar 2015
Status
Connected
Planning consent
Granted 22 Sep 2014
Gwynedd, reference C14/0498/20/LL · Source: REPD
Customer
Quintas Energy UK
Site name
Parciau Solar Park
Address
Parciau Solar Farm. Griffiths Crossing., Caernarfon, Caernarfon, North Wales, LL55 1TS
Grid reference
Easting 250245, northing 365232
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Pentir
Bulk supply point
BANGOR GT2 / CAERNARFON GT2
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 15 MW registered
Registered capacity
15 MW
Maximum export capacity
15 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300060584280
Import MPAN
1300060584270
Last updated
11 Nov 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Pentir

GSP view

12 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 392 MW: 93 MW connected, 299 MW accepted to connect.

  • Glyn RhonwySnowdonia Pumped Hydro (Quarry Battery Company), StorageAccepted99.9 MW
  • Tyddyn ForganFirstway Solar Ltd, StorageAccepted99.8 MW
  • Llys GwyntRNA Energy Ltd, StorageAccepted99 MW
  • DolgarrogRwe Innogy Uk, StorageConnected39 MW
  • Moel Maelogen CMoelagan Fawr, WindConnected11.7 MW
  • TeyrdanSolarConnected9 MW
  • FERODO (Swn y Mor)Conrad Energy, Gas and other fossil, FERODO T1 primaryConnected5 MW
  • Ysbyty GwyneddYsbyty Gwynedd, Gas and other fossil, BANGOR HOSP T1 / EITHINOG T1 / BANGOR UNIVERSITY T1 / HIRAEL T1 primaryConnected4.4 MW

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.