Glyn Rhonwy
Snowdonia Pumped Hydro (Quarry Battery Company) at Pentir
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Jan 2025
- Status
- Accepted to connect
- Planning consent
- Granted 8 Mar 2017
The Planning Inspectorate - National Infrastructure, reference EN010072 · Source: REPD - Customer
- Snowdonia Pumped Hydro (Quarry Battery Company)
- Site name
- Glyn Rhonwy
- Address
- Glyn Rhonwy, Llanberis, Caernarfon, North Wales, LL55 4EL
- Grid reference
- Easting 257240, northing 360808
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Pentir
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Mechanical - Pumped Hydro: 99.9 MW registered
- Registered capacity
- 99.9 MW
- Change to maximum export capacity
- 99.9 MW
- Change to maximum import capacity
- 130 MW
- Flexible connection
- Not stated
- In a connection queue
- Yes
- Date accepted
- Not stated
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Sep 2020
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Pentir
GSP view12 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 392 MW: 93 MW connected, 299 MW accepted to connect.
- Ysbyty GwyneddYsbyty Gwynedd, Gas and other fossil, BANGOR HOSP T1 / EITHINOG T1 / BANGOR UNIVERSITY T1 / HIRAEL T1 primaryConnected4.4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.