Mosspark Solar Farm (MPSF)

REG Developments Ltd at Dumfries

SPEN Embedded Capacity Register >1MW, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 May 2030
Status
Accepted to connect
Customer
REG Developments Ltd
Site name
Mosspark Solar Farm (MPSF)
Address
Mosspark, Annan Road, Dumfries, Dumfries and Galloway, DG1 4PH
Grid reference
Easting 299666, northing 575069
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Dumfries
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 20 MW registered
Energy source 2
Solar, Photovoltaic: 50 MW registered
Registered capacity
70 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
20 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
2 Apr 2024
Date connected
Not stated
Distribution reinforcement reference
619291354
Transmission reinforcement reference
Not published by SPEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
30 Sep 2024
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Dumfries

GSP view

7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 176 MW: 56 MW connected, 120 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose