Mosspark Energy Park

REG POWER DEVELOPMENTS LIMITED at Dumfries

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 May 2030
Status
Accepted to connect
Customer
REG POWER DEVELOPMENTS LIMITED
Site name
Mosspark Energy Park
Address
Mosspark, Annan Road, Dumfries, Dumfries and Galloway, DG1 4HP
Grid reference
Easting 299666, northing 575069
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Dumfries
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 20 MW registered
Energy source 2
Solar, Photovoltaic: 50 MW registered
Registered capacity
70 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
20 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
2 Apr 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
30 Apr 2026
Tracked since
July 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the July 2026 edition, across 3 editions.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Dumfries

GSP view

6 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 176 MW: 56 MW connected, 120 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?