Hooton Bio Power
North Lanarkshire Bio Power Limited at Capenhurst
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 14 Aug 2020
- Status
- Connected
- Customer
- North Lanarkshire Bio Power Limited
- Site name
- Hooton Bio Power
- Address
- Northern Bio Power Ltd, North Road, Ellesmere, Wirral, CH65 1AJ
- Grid reference
- Easting 337420, northing 380079
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Capenhurst
- Bulk supply point
- HOOTON PARK 1B / HOOTON PARK 2B
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 29 MW registered
- Registered capacity
- 29 MW
- Maximum export capacity
- 29 MW
- Maximum import capacity
- 7.5 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- 10 May 2019
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- May 2026 editionCustomer stated as North Lanarkshire Bio Power Limited (not stated in the April 2026 edition)
Also at Capenhurst
GSP view21 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 601 MW: 217 MW connected, 384 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose