Flint C, Aber Park, Aber Road, Flint, Fl

Conrad Energy (Developments) Ltd at Connahs Quay

SPEN Embedded Capacity Register >1MW, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Conrad Energy (Developments) Ltd
Site name
Flint C, Aber Park, Aber Road, Flint, Fl
Address
Aber Park Industrial Centre, Aber Road, Flint, Dee Valley and Mid Wales, CH6 5EX
Grid reference
Easting 323757, northing 373206
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Connahs Quay
Bulk supply point
BRYMBO GT2 / HAWARDEN GT2 / HOLYWELL GT2
Primary substation
FLINT T1 / FLINT T2
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 1.1 MW registered
Registered capacity
1.1 MW
Change to maximum export capacity
1.1 MW
Change to maximum import capacity
1 MW
Flexible connection
Not stated
In a connection queue
Yes
Date accepted
Not stated
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
25 Jul 2023
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked from the March 2026 edition to the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

  • June 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
  • May 2026 edition
    Customer stated as Conrad Energy (Developments) Ltd (not stated in the April 2026 edition)

Also at Connahs Quay

GSP view

32 other sites at this grid supply point in the September 2026 edition, 3 of them at FLINT T1 / FLINT T2, the same primary substation. In all, the sites here total 459 MW: 281 MW connected, 178 MW accepted to connect.

See all 32

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?