QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

Conrad energy (developments) limited

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026, SPEN’s September 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “Conrad energy (developments) limited” (2 sites), “CONRAD ENERGY (DEVELOPMENTS) LTD” (1 site), “Conrad Energy (Developments) Limited” (1 site), “Conrad Energy (Developments) Ltd” (1 site) and “Conrad energy (developments) ltd” (1 site).

6sites of 1 MW and over
99.5 MWcapacity
9.7 MWconnected (2 sites)
89.8 MWaccepted to connect (4 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition17.2 MW7.2 MW–
NGEDAugust 2026 edition380.7 MW–80.7 MW
SPENSeptember 2026 edition12.5 MW2.5 MW–
ENWLOctober 2026 edition19.1 MW–9.1 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage380.7 MW–80.7 MW
Gas and other fossil318.8 MW9.7 MW9.1 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Thurloxton energy storage plantNGEDBridgwater SgpStorageAccepted to connect49.9
Land at parsonage farmNGEDTaunton SgpStorageAccepted to connect15.4
Tuxton farmNGEDAbham SgpStorageAccepted to connect15.4
MIDDLETON FLEXIBLE GASENWLWHITEGATE GSPGas and other fossilAccepted to connect9.053
(ANM) Eagle Business ParkUKPNWalpoleGas and other fossilConnected7.2
Aber ParkSPENConnahs QuayGas and other fossilConnected2.5

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Bridgwater SgpNGED1–49.9 MW
Abham SgpNGED1–15.4 MW
Taunton SgpNGED1–15.4 MW
WHITEGATE GSPENWL1–9.1 MW
WalpoleUKPN17.2 MW–
Connahs QuaySPEN12.5 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 1 site matched. Every August site and every September site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 1 site matched. Every September site and every October site had a match in the other edition.

  • Aber ParkSPEN, May 2026 editionCustomer stated as Conrad Energy (Developments) Ltd (not stated in the April 2026 edition)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?