Flint Landfill

Flintshire County Council at Connahs Quay

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Flintshire County Council
Site name
Flint Landfill
Address
Castle Park Industrial Estate, Flint, Dee Valley and Mid Wales, CH6 5XA
Grid reference
Easting 324141, northing 373698
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Connahs Quay
Bulk supply point
BRYMBO GT2 / HAWARDEN GT2 / HOLYWELL GT2
Primary substation
FLINT T1 / FLINT T2
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2 MW registered
Registered capacity
2 MW
Maximum export capacity
2 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300060936398
Import MPAN
Not stated
Last updated
14 Jul 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Connahs Quay

GSP view

31 other sites at this grid supply point in the September 2026 edition, 2 of them at FLINT T1 / FLINT T2, the same primary substation. In all, the sites here total 459 MW: 281 MW connected, 178 MW accepted to connect.

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose