Flint Landfill
Flintshire County Council at Connahs Quay
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Flintshire County Council
- Site name
- Flint Landfill
- Address
- Castle Park Industrial Estate, Flint, Dee Valley and Mid Wales, CH6 5XA
- Grid reference
- Easting 324141, northing 373698
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Connahs Quay
- Bulk supply point
- BRYMBO GT2 / HAWARDEN GT2 / HOLYWELL GT2
- Primary substation
- FLINT T1 / FLINT T2
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 2 MW registered
- Registered capacity
- 2 MW
- Maximum export capacity
- 2 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300060936398
- Import MPAN
- Not stated
- Last updated
- 14 Jul 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Connahs Quay
GSP view31 other sites at this grid supply point in the September 2026 edition, 2 of them at FLINT T1 / FLINT T2, the same primary substation. In all, the sites here total 459 MW: 281 MW connected, 178 MW accepted to connect.
- Aber Park Gas GenerationConrad Energy, Gas and other fossil, FLINT T1 / FLINT T2 primaryConnected5 MW
- Aber ParkConrad Energy (Developments) Ltd, Gas and other fossil, FLINT T1 / FLINT T2 primaryConnected2.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose