Annan Road BESS
Flexion Energy UK Storage Ltd at Dumfries
SPEN Embedded Capacity Register >1MW, July 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 24 Aug 2028
- Status
- Accepted to connect
- Customer
- Flexion Energy UK Storage Ltd
- Site name
- Annan Road BESS
- Address
- Annan Road, Land at Annan Road, Dumfries and Galloway, DG1 3SE
- Grid reference
- Easting 335918, northing 714104
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Dumfries
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 26 MW registered
- Registered capacity
- 26.4 MW
- Change to maximum export capacity
- 20 MW
- Change to maximum import capacity
- 20 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 27 Apr 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- SPT-RI-161, SPT-RI-168, SPT-RI-222, SPT-RI-227, SPT-RI-230, SPT-RI-233, SPT-RI-2731, SPT-RI-2741, SPT-RI-288, SPT-RI-298
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 29 Nov 2024
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.
Changes to the details QueueWatch tracks, newest first.
- August 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No change to any detail QueueWatch tracks.
Also at Dumfries
GSP view7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 176 MW: 56 MW connected, 120 MW accepted to connect.
- Dargavel BiomassScotgen (Dumfries) Ltd, Bioenergy and waste, HEATHHALL (11kV) primaryConnected6.5 MW
- West Roucan Farm / Tinwald HouseWest Roucan Farm, Bioenergy and waste, HEATHHALL (11kV) primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?