QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

TULLO WIND FARM

At FIDDES

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Not stated
Site name
TULLO WIND FARM
Address
Not stated
Grid reference
Not stated
Licence area
North of Scotland (SHEPD)
Grid supply point
FIDDES
Bulk supply point
Not stated
Primary substation
STONEHAVEN
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 17 MW registered
Registered capacity
17 MW
Maximum export capacity
17 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Feb 2026
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at FIDDES

GSP view

18 other sites at this grid supply point in the October 2026 edition, 1 of them at STONEHAVEN, the same primary substation. In all, the sites here total 456 MW: 86 MW connected, 370 MW accepted to connect.

See all 18

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose