QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Site not named

At LOVEDEAN GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Not stated
Site name
Not stated
Address
Not stated
Grid reference
Not stated
Licence area
Southern England (SEPD)
Grid supply point
LOVEDEAN GSP
Bulk supply point
WYMERING
Primary substation
GAMBLE ROAD
Connection voltage
11 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 2.012 MW registered
Registered capacity
2.012 MW
Maximum export capacity
2.012 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056643695
Import MPAN
2000027397706
Last updated
12 Feb 2026
Tracked since
September 2023 edition

Change history

Tracked since the September 2023 edition, across 37 editions.

Changes to its status, capacity, technology or customer, newest first.

  • November 2023 edition
    Capacity changed from 2.118 MW to 2.012 MW

Also at LOVEDEAN GSP

GSP view

58 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.

See all 58

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose