QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

100MW BESS

At LOVEDEAN GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2038
Status
Accepted to connect
Customer
Not stated
Site name
100MW BESS
Address
LAND ADJACENT MILL COPSE, OLD MILL LANE LOVEDEAN, PORTSMOUTH, HAMPSHIRE, PO8 0SN
Grid reference
Easting 467053, northing 113894
Licence area
Southern England (SEPD)
Grid supply point
LOVEDEAN GSP
Bulk supply point
Not stated
Primary substation
LOVEDEAN
Connection voltage
132 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 100 MW registered
Registered capacity
100 MW
Change to maximum export capacity
105.263 MW
Change to maximum import capacity
105.263 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
27 Mar 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
April 2025 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the April 2025 edition, across 20 editions.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Export capacity changed from 100 MW to 105.263 MW
  • July 2026 edition
    Export capacity changed from 105.263 MW to 100 MW
  • June 2026 edition
    Export capacity changed from 100 MW to 105.263 MW
  • May 2026 edition
    Export capacity changed from 105.263 MW to 100 MW
  • April 2026 edition
    Export capacity changed from 100 MW to 105.263 MW
  • February 2026 edition
    Export capacity changed from 99.9 MW to 100 MW
  • November 2025 edition
    Target energisation date stated as 31 Dec 2038 (not stated in the October 2025 edition)

Also at LOVEDEAN GSP

GSP view

57 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.

See all 57

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?