BOURNE PARK PV GENERATION

BOURNE PARK SOLAR LIMITED at CHICKERELL GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
18 Mar 2015
Status
Connected
Customer
BOURNE PARK SOLAR LIMITED
Site name
BOURNE PARK PV GENERATION
Address
DORCHESTER, DORSET, DT2 7TU
Grid reference
Easting 372335, northing 97529
Licence area
Southern England (SEPD)
Grid supply point
CHICKERELL GSP
Bulk supply point
CHICKERELL
Primary substation
BOURNE PARK PV GEN
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 4.75 MW registered
Registered capacity
4.75 MW
Maximum export capacity
4.75 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056098827
Import MPAN
2000056098818
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2023 edition
    Capacity changed from 7.895 MW to 4.75 MW

Also at CHICKERELL GSP

GSP view

12 other sites at this grid supply point in the November 2026 edition, 2 of them at BOURNE PARK PV GEN, the same primary substation. In all, the sites here total 207 MW: 77 MW connected, 130 MW accepted to connect.

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?