BUCKLAND RIPERS 20MW PV & BESS
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 26 Mar 2027
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- BUCKLAND RIPERS 20MW PV & BESS
- Address
- WEYMOUTH, DORSET, DT3 4EW
- Grid reference
- Easting 365282, northing 85784
- Licence area
- Southern England (SEPD)
- Grid supply point
- CHICKERELL GSP
- Bulk supply point
- CHICKERELL
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 45 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 0.526 MW registered
- Registered capacity
- 45 MW
- Change to maximum export capacity
- 0.526 MW
- Change to maximum import capacity
- 0.526 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 26 Mar 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 May 2026
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionExport capacity changed from 45 MW to 0.526 MW
- June 2026 editionExport capacity changed from 0.526 MW to 45 MW
Also at CHICKERELL GSP
GSP view12 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 207 MW: 77 MW connected, 130 MW accepted to connect.
- RAMPISHAM WOODS SOLAR PARK LIMITEDRAMPISHAM WOODS SOLAR PARK LIMITED, Solar, MAIDEN NEWTON primaryConnected6.935 MW
- BOURNE PARK PV GENERATIONBOURNE PARK SOLAR LIMITED, Solar, BOURNE PARK PV GEN primaryConnected4.75 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?