BOURNE PARK - ECO PIDDLEHINTON AD
BOURNE PARK SOLAR LIMITED at CHICKERELL GSP
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 20 Feb 2015
- Status
- Connected
- Customer
- BOURNE PARK SOLAR LIMITED
- Site name
- BOURNE PARK - ECO PIDDLEHINTON AD
- Address
- BOURNE PARK GENERATION ECO PIDDLEHINTON AD, DORCHESTER, DORSET, DT2 7TU
- Grid reference
- Easting 372306, northing 97577
- Licence area
- Southern England (SEPD)
- Grid supply point
- CHICKERELL GSP
- Bulk supply point
- CHICKERELL
- Primary substation
- BOURNE PARK PV GEN
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 1.235 MW registered
- Registered capacity
- 1.235 MW
- Maximum export capacity
- 1.235 MW
- Maximum import capacity
- 0.76 MW
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000056151115
- Import MPAN
- 2000056151106
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at CHICKERELL GSP
GSP view12 other sites at this grid supply point in the November 2026 edition, 2 of them at BOURNE PARK PV GEN, the same primary substation. In all, the sites here total 207 MW: 77 MW connected, 130 MW accepted to connect.
- BOURNE PARK PV GENERATIONBOURNE PARK SOLAR LIMITED, Solar, BOURNE PARK PV GEN primaryConnected4.75 MW
- RAMPISHAM WOODS SOLAR PARK LIMITEDRAMPISHAM WOODS SOLAR PARK LIMITED, Solar, MAIDEN NEWTON primaryConnected6.935 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?