49.9MW BESS

NAREC DE LTD at CHICKERELL GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
25 May 2027
Status
Accepted to connect
Customer
NAREC DE LTD
Site name
49.9MW BESS
Address
LAND OFF COLD HARBOUR LANE, CHICKERELL, WEYMOUTH, DORSET, DT4 9RZ
Grid reference
Easting 366133, northing 80982
Licence area
Southern England (SEPD)
Grid supply point
CHICKERELL GSP
Bulk supply point
CHICKERELL
Primary substation
CHICKERELL
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 49.9 MW registered
Registered capacity
49.9 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
52.526 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
29 May 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
June 2025 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the June 2025 edition, across 18 editions.

Changes to the details QueueWatch tracks, newest first.

  • February 2026 edition
    Target energisation date stated as 25 May 2027 (not stated in the January 2026 edition)
  • December 2025 edition
    Target energisation date not stated (25 May 2027 in the November 2025 edition)
  • November 2025 edition
    Target energisation date stated as 25 May 2027 (not stated in the October 2025 edition)

Also at CHICKERELL GSP

GSP view

12 other sites at this grid supply point in the November 2026 edition, 2 of them at CHICKERELL, the same primary substation. In all, the sites here total 207 MW: 77 MW connected, 130 MW accepted to connect.

See all 12

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?