BINSTED FARM PV
LIGHTSOURCE SPV 141 LIMITED at LOVEDEAN GSP
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Mar 2016
- Status
- Connected
- Planning consent
- Granted 28 Sep 2015
Arun, reference WA/34/15/PL · Source: REPD - Customer
- LIGHTSOURCE SPV 141 LIMITED
- Site name
- BINSTED FARM PV
- Address
- ARUNDEL, WEST SUSSEX, BN18 0LN
- Grid reference
- Easting 498150, northing 106380
- Licence area
- Southern England (SEPD)
- Grid supply point
- LOVEDEAN GSP
- Bulk supply point
- CHICHESTER
- Primary substation
- BINSTEAD FARM PV
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 3.981 MW registered
- Registered capacity
- 3.981 MW
- Maximum export capacity
- 3.981 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000056562317
- Import MPAN
- 2000056562292
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at LOVEDEAN GSP
GSP view57 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.