BARNHAM

WEL SOLAR PARK 22 LIMITED at LOVEDEAN GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
29 Mar 2017
Status
Connected
Planning consent
Granted 24 Feb 2016
Arun, reference BN/29/15/PL · Source: REPD
Customer
WEL SOLAR PARK 22 LIMITED
Site name
BARNHAM
Address
BARNHAM COURT FARMS PV, BARNHAM, BOGNOR REGIS, PO22 0BP
Grid reference
Easting 495592, northing 103516
Licence area
Southern England (SEPD)
Grid supply point
LOVEDEAN GSP
Bulk supply point
CHICHESTER
Primary substation
BILSHAM
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 1.2 MW registered
Registered capacity
1.2 MW
Maximum export capacity
1.2 MW
Maximum import capacity
0.086 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056878830
Import MPAN
2000056878821
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at LOVEDEAN GSP

GSP view

57 other sites at this grid supply point in the November 2026 edition, 4 of them at BILSHAM, the same primary substation. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.

See all 57

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.