QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BAKER BARRACKS - PV

PUBLIC POWER SOLUTIONS LTD at LOVEDEAN GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
PUBLIC POWER SOLUTIONS LTD
Site name
BAKER BARRACKS - PV
Address
BAKER BARRACKS, THORNEY ISLAND, EMSWORTH, HAMPSHIRE, PO10 8DH
Grid reference
Easting 475900, northing 102900
Licence area
Southern England (SEPD)
Grid supply point
LOVEDEAN GSP
Bulk supply point
HAVANT
Primary substation
EMSWORTH
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 1.2 MW registered
Registered capacity
1.2 MW
Change to maximum export capacity
0.8 MW
Change to maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
Not published by SSEN
Date accepted
9 Aug 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at LOVEDEAN GSP

GSP view

58 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.

See all 58

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose