PUTTON LANE
SSEN Embedded Capacity Register, May 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 3 Jun 2037
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- PUTTON LANE
- Address
- PUTTON LANE, CHICKERALL, WEYMOUTH, DORSET, DT4 9UX
- Grid reference
- Easting 365422, northing 79793
- Licence area
- Southern England (SEPD)
- Grid supply point
- CHICKERELL GSP
- Bulk supply point
- CHICKERELL
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 52.68 MW registered
- Registered capacity
- 52.68 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- 52.632 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 19 Jul 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2024 edition
Change history
Tracked from the August 2024 edition to the May 2026 edition, across 22 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- November 2025 editionTarget energisation date stated as 3 Jun 2037 (not stated in the October 2025 edition)
Also at CHICKERELL GSP
GSP view13 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 207 MW: 77 MW connected, 130 MW accepted to connect.
- RAMPISHAM WOODS SOLAR PARK LIMITEDRAMPISHAM WOODS SOLAR PARK LIMITED, Solar, MAIDEN NEWTON primaryConnected6.935 MW
- BOURNE PARK PV GENERATIONBOURNE PARK SOLAR LIMITED, Solar, BOURNE PARK PV GEN primaryConnected4.75 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose